81001ISO 81001-1 Revision Checker
The revision record Retrieved 21 October 2026 Stage 40.20 ยท DIS ballot initiated: 12 weeks Planning date 14 Sep 2027, an estimate
Clause3.1Normative
The frame of the document

Organisations, people and roles

ISO/DIS 81001-1, Clause 3.1Basis: public recordRead 21 October 2026

The first edition's first term group covers organisations, people and roles. The draft's definitions are not public.

What the public record carries

Not stated in the public record beyond the group title. The public contents of the first edition place organisations, people and roles together in 3.1, which tells the reader that the document treats accountability as a property of a named party rather than of a system alone. The terms inside the group, and any change in the draft, must be read from the published text.

Basis. The public preview carries the group title and the introduction; the definitions are not public.

Why it matters in a health estate

Most failures in health software are not failures of a control but of an unassigned responsibility. A transition point with two owners has none. A role defined only by a job title does not say what the person can do in the system. The term group matters because it forces the register to name a party and a role, not a department.

What to do now

For every unit in the register name a role and a named person, not a team. Record what the role can do in the system and which transition point it owns. Where a role is shared, say which party decides and which party is informed.

The evidence a reviewer will ask for

EvidenceWhat it is
Role mapEach role, the named holder, what the role can do in the system and the transition point owned
RACI noteWho decides, who is consulted and who is informed at each transition point
Delegation recordWhere a responsibility is delegated, the instrument and its date
Vacancy noteAny role without a holder, with the interim arrangement

What a reviewer will ask

An auditor will ask who owns a transition point and what that person can actually do. A title without an access description does not answer.

Common gaps

  • A responsibility is assigned to a team rather than a person
  • A role owns a transition point on paper but has no access to the system that records it
  • A delegated responsibility has no written instrument
  • A vacancy leaves a transition point unowned and nobody notices

Before the draft publishes

Take the role map and mark every row without a named holder. Fill or escalate those rows before the next review.

If the draft changes this row

The draft is edition 2 and 62 pages, one page more than the first edition. Its text and any change summary are not public as at 21 October 2026. This row follows the published first edition's structure, which is what your procedure should name today. The change watch emails you when the record changes or the draft text lands, and the row is re-read then. No one can tell you what moved before that, and this page does not guess.

Related rows

Who this binds. The people lead and the CISO, because this group of terms decides who is accountable for what across the life cycle.